Berrima Road Stormwater Works

Share on Facebook Share on Twitter Share on Linkedin Email this link


The City of Marion is installing larger stormwater culverts under Berrima Road to mitigate long-standing significant flooding issues in the area.

To facilitate this important infrastructure upgrade, Berrima Road will be closed to traffic and pedestrians from Patpa Drive to Bella Drive while works are ongoing.

Traffic management is being provided at the intersection of Edward Beck Drive and Young Street between 7 am to 11 am and 1 pm to 5 pm throughout the project to aid traffic flow. If possible, commuters are asked to please use the entrance/exit into Sheidow Park from the south. See Traffic Control Plan Here


** Urgent pedestrian update **

Please note, due to the redevelopment of Hugh Johnson Boulevard Reserve much of this recreation area is now a construction site and pedestrian access is restricted. Pedestrian access is not permitted near the stormwater works on Berrima Road. Pedestrians will be redirected along Patpa Road.

You can find out more about the work being done at Hugh Johnson Boulevard Reserve HERE.


Keep Updated:

  • Latest project updates will be added to the 'News Feed' below.
  • Any questions not answered in the FAQ section can be asked in the below 'Questions' tab and you will receive a reply within 48 hours.
  • To receive notifications of updates on this project please subscribe on the right of this page


The City of Marion is installing larger stormwater culverts under Berrima Road to mitigate long-standing significant flooding issues in the area.

To facilitate this important infrastructure upgrade, Berrima Road will be closed to traffic and pedestrians from Patpa Drive to Bella Drive while works are ongoing.

Traffic management is being provided at the intersection of Edward Beck Drive and Young Street between 7 am to 11 am and 1 pm to 5 pm throughout the project to aid traffic flow. If possible, commuters are asked to please use the entrance/exit into Sheidow Park from the south. See Traffic Control Plan Here


** Urgent pedestrian update **

Please note, due to the redevelopment of Hugh Johnson Boulevard Reserve much of this recreation area is now a construction site and pedestrian access is restricted. Pedestrian access is not permitted near the stormwater works on Berrima Road. Pedestrians will be redirected along Patpa Road.

You can find out more about the work being done at Hugh Johnson Boulevard Reserve HERE.


Keep Updated:

  • Latest project updates will be added to the 'News Feed' below.
  • Any questions not answered in the FAQ section can be asked in the below 'Questions' tab and you will receive a reply within 48 hours.
  • To receive notifications of updates on this project please subscribe on the right of this page
  • Opening Berrima Road and Lander Young intersection

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    supporting image
    We’re happy to announce the opening of Berrima Road, Sheidow Park.


    We’re pleased to have completed this essential stormwater project before the onset of winter.

    Works completed on this project so far include:
    • Stormwater culvert installed
    • Kerb & water table and stormwater side entry pits installed
    • Road surface reinstatement completed
    • Eastern up-stream rock pitching pictured has been completed

    Works in progress, through until the proposed completion date 22 April, include:
    • Western downstream gabion walls and weirs
    • Downstream scouring rock pitching
    • Battering topsoiling southern wall
    • Screening rock and dirt materials
    • Pedestrian fencing to both sides
    • Overlay asphalt through road work areas
    • Planting of ground covers, vegetation, trees and mulching
    A big thanks to everyone involved, including project contractors, Beltrame Civil.
  • Updated Pedestrian Route

    Share on Facebook Share on Twitter Share on Linkedin Email this link

  • Latest News on Berrima Rd Stormwater Works

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    supporting image

    Thanks to everyone who provided feedback and for your patience regarding redirected traffic in the area, relating to the essential stormwater works.

    Traffic control has been allocated at the intersection of Patpa Road, Lander Road and Young Street between 7 am to 11 am and 1 pm to 5 pm throughout the project to aid traffic flow.

    We have observed that Woodend primary School experienced vehicle congestion issues with student drop offs on Monday morning, even with the traffic control in place, and as such two extra traffic controllers have since been allocated.

    As suggested previously, we recommend that you allow an extra 5 to 10 minutes on all trips through this area during peak hour

    Traffic Management Plan close-up images available in 'Documents'.