BACKGROUND

In 2017, the City of Marion endorsed a Playground Framework to ensure the community’s playgrounds were well-designed, well-located, safe and fun for users.

In the last 8 years, 41 playgrounds have been upgraded and an additional 13 are currently in the process of being designed or constructed.

As part of the Playground Framework, a number of playgrounds will be upgraded and some will be removed to ensure that:

  • Current and future playgrounds are renewed at appropriate times to ensure safety of the community.
  • Playgrounds are in an accessible location and spread as evenly as possible throughout the City of Marion – this may include removal of playgrounds due to oversupply in a particular area. Additionally, it may include new playgrounds to address a deficiency in an area.
  • Council resources are used effectively, in line with Council’s strategic objectives of keeping rates as low as possible whilst providing services that are fair and equitable throughout the City of Marion.


PLAYGROUND FRAMEWORK IMPLEMENTATION

The playground equipment at Westall Way Reserve has reached the end of its life expectancy and will be removed.

We propose to replace the playground with minor landscaping and additional trees.

The existing trees and pathway will remain.

For more information:

If you wish to comment about the changes, please visit Playground Removal and Concept Design Feedback by 5pm 26 April 2018.

All feedback will be collated and a report provided to Council prior to works commencing.

Proposed works are due to commence in May 2018.


ALTERNATIVE PLAYGROUNDS

Alternative playgrounds in the area include:

BACKGROUND

In 2017, the City of Marion endorsed a Playground Framework to ensure the community’s playgrounds were well-designed, well-located, safe and fun for users.

In the last 8 years, 41 playgrounds have been upgraded and an additional 13 are currently in the process of being designed or constructed.

As part of the Playground Framework, a number of playgrounds will be upgraded and some will be removed to ensure that:

  • Current and future playgrounds are renewed at appropriate times to ensure safety of the community.
  • Playgrounds are in an accessible location and spread as evenly as possible throughout the City of Marion – this may include removal of playgrounds due to oversupply in a particular area. Additionally, it may include new playgrounds to address a deficiency in an area.
  • Council resources are used effectively, in line with Council’s strategic objectives of keeping rates as low as possible whilst providing services that are fair and equitable throughout the City of Marion.


PLAYGROUND FRAMEWORK IMPLEMENTATION

The playground equipment at Westall Way Reserve has reached the end of its life expectancy and will be removed.

We propose to replace the playground with minor landscaping and additional trees.

The existing trees and pathway will remain.

For more information:

If you wish to comment about the changes, please visit Playground Removal and Concept Design Feedback by 5pm 26 April 2018.

All feedback will be collated and a report provided to Council prior to works commencing.

Proposed works are due to commence in May 2018.


ALTERNATIVE PLAYGROUNDS

Alternative playgrounds in the area include:

  • CLOSED: This survey was open from 3 April 2018 until 26 April 2018.
    Consultation for this project was open from 3 April 2018 until 26 April 2018.
    Share [CLOSED] Westall Way Reserve, Sheidow Park | Playground Removal and Concept Design | Survey Open 03 April - 26 April 2018 on Facebook Share [CLOSED] Westall Way Reserve, Sheidow Park | Playground Removal and Concept Design | Survey Open 03 April - 26 April 2018 on Twitter Share [CLOSED] Westall Way Reserve, Sheidow Park | Playground Removal and Concept Design | Survey Open 03 April - 26 April 2018 on Linkedin Email [CLOSED] Westall Way Reserve, Sheidow Park | Playground Removal and Concept Design | Survey Open 03 April - 26 April 2018 link