Background

The City of Marion is upgrading the playground at Willoughby Avenue Reserve. This project is a key priority in the Open Space Plan 2024–2034. The upgrade will improve the playground and provide more play options at the reserve.

The playground is close to Morphettville Racecourse, on a site that once had horse stables. The new playground will have a horse theme to celebrate this history.

The new design features:

  • a main play structure with slides
  • sand and water play with a baby horse sculpture
  • horse and cart climbing equipment
  • swings
  • an accessible spinner
  • a horse themed rocker
  • a junior obstacle trail
  • music play with a cow bell
  • goals for different sports
  • an unsealed BMX track


We would like your feedback on the draft concept plan and to hear how much you support it. Your feedback will help shape the design to meet community needs. We will consider the survey results alongside the budget, safety standards and limits of the site.


Join the conversation

View the draft playground concept plan and tell us what you think by completing the short survey in the 'Comments and questions' tab.

Come along to a community drop-in session at Willoughby Avenue Reserve on Monday 30 November, from 4 pm to 6 pm, to find out more about the design.

Consultation is open until 5 pm on Monday 14 December 2026.

Design plan

The playground works are expected to be completed by the end of June 2027. Nearby residents will receive a notice about the works before they begin.

For more information about the design or to request a printed copy, contact the Open Space and Recreation Planning team on 8375 6600.

Frequently asked questions

The playground has reached the end of its useful life and needs replacing. Funding for the upgrade has been provided as part of Council’s approved Open Space Plan 2024–2034.

A postcard with project information and a link to the survey was sent to all residents within 400 metres of the reserve.

Children have already built a bike track at the reserve. We would like to create a more permanent track in a central location, away from fences.

The proposed track would be unsealed and about 80 metres long.

A workshop will be held with interested residents to finalise the design. If you would like to take part, please let us know in the survey.

No, a public toilet will not be considered as part of this upgrade.

This is a neighbourhood playground, and these types of playgrounds generally do not have public toilets. No funding has been set aside for a toilet at this reserve.

After we review the community’s feedback, we will prepare a detailed design. A contractor will then be appointed to carry out the works.

The upgrade is expected to be completed by the end of June 2027. Timing may change depending on contractor availability, weather and site conditions.

Yes, dogs can be off lead at Willoughby Avenue Reserve. However, they must be under control at all times and on a lead within 5 metres of play equipment.

A drinking fountain with a dog bowl will be provided away from the play equipment.

No additional funding has been provided for a shade sail over the play equipment.

The reserve has mature trees. The playground will be designed to make the most of their shade.

Tell us what you think

Next steps

Timeline

  • Timeline item 1 - active

    Draft concept plan shared with the community

  • Timeline item 2 - incomplete

    Community drop-in session

    Monday 30 November 2026 from 4 pm to 6 pm
    at Willoughby Avenue Reserve

  • Timeline item 3 - incomplete

    Consultation closes

    5 pm, Monday 14 December 2026

  • Timeline item 4 - incomplete

    Playground upgrade

    Works are expected to be completed by the end of June 2027. Timing may change depending on weather and site conditions.

Who's listening

Contact Us

Contact Information
Name Open Space & Recreation Planning
Phone 08 8375 6600
Email communityengagement@marion.sa.gov.au